Editorial Reviews. About the Author. Jean O'Grady is associate editor of the Collected Works of leondumoulin.nl: The Critical Path and Other Writings on Critical Theory, (Collected Works of Northrop Frye) eBook: Eva Kushner, Alvin.
Table of contents
Jean O'Grady and Goldwin French. The Diaries of Northrop Frye, — Northrop Frye on Literature and Society, — Northrop Frye on Modern Culture. Northrop Frye on Canada.
SearchWorks Catalog
Jean O'Grady and David Staines. A Study of William Blake.
Northrop Frye's Notebooks on Romance. Northrop Frye on Milton and Blake. Joseph Adamson and Jean Wilson.
The Bible and Literature. Northrop Frye's Notebooks on Renaissance Literature.
- Knowledge Discovery in Proteomics.
- Collected Works of Northrop Frye - Wikipedia!
- Interviews With Northrop Frye - Jean (EDT) O'Grady - bøker() | Adlibris Bokhandel!
Northrop Frye's Notebooks for "Anatomy of Criticism. Interviews with Northrop Frye.
Northrop Frye's Fiction and Miscellaneous Writings. Denham and Michael Dolzani.
University of Toronto
Eva Kushner and Jean O'Grady. Northrop Frye's Writings on Shakespeare and the Renaissance. Troni Grande and Garry Sherbert. Denham and Michael Dolzani. A world in a grain of sand: The "third book" notebooks of Northrop Frye, A glorious and terrible life with you: An important marker of Frye's development as a critic. The Critical Path openly addresses some of the overarching philosophical topics that he had previously been hesitant to discuss fully: Accompanied by the rigorous annotation for which the series is renowned, this scholarly edition is a major contribution to Frye studies and to the field of literary criticism and theory as a whole.
Myth and Poetry 4. Preface to Bachelard's The Psychoanalysis of Fire 5.
Collected Works of Northrop Frye
After the Invocation, a Lapse into Litany 6. Criticism, Visible and Invisible 7. Structure and Spirit of Comedy 8. Norms of Satire 9. Verse and Prose Varieties of Literary Utopias Letter to the English Institute, Reflections in a Mirror Design as a Creative Principle in the Arts Literature and Myth Welcoming Remarks to Conference on Editorial Problems,
- GABA: 54 (Advances in Pharmacology).
- Muddy Water, Romance and Murder in Henry County.
- Post navigation?
- Who Will Hug the Sun? (In My Sisters World Book 2).
- Programming WPF: Building Windows UI with Windows Presentation Foundation.
- Dette synes andre om boken.
- The critical path and other writings on critical theory, 1963-1975 /.